PT. Energi Mineral Langgeng has been conducted various activities durring 2010 until now,
- Including G&G Studies in 2010
- 2D Seismic 550 Km in Situbondo and Giligenting Area In 2011
- and Drill one Exploration Well (ENC-1) in Tanjung Area with Techical Discovery status in 2012
In the current year PT. Energi Mineral langgeng planning to drill another one Exploration well (ENC-2), 2D Marine Seismic and Microgravity Survey. The drilling program will be focused at ENC Struktur delineation in the Northern Part of the Block, The 2D Marine seismic will be conducted in the Southern Part of the Block and Microgravity Survey will be conducted in the Southern